LOT LOGIC™LEVEL 1 — THE FOUNDATION
You're one step away from the complete tactical system for evaluating land before a single dollar changes hands. Built from 30+ years of field experience and nearly $1 billion in land transactions. Lifetime access. 14-day money-back guarantee.
Enroll Now and You Will Get:
- The Complete 3-Phase LOT LOGIC™ System Phase I Desktop Scan → Phase II Site Walk → Phase III Deep Dive Feasibility. Complete system digital checklists. The full operating system top brokers use to evaluate any property before money moves.
- 4 Core Training Videos Over-the-shoulder, click-here-do-this training. Introduction, Phase I screen share, Phase II POV site walk, and Phase III Excel walkthrough. Stream on demand. Rewatch any time. Yours permanently.
- LOT LOGIC™ Road Map The visual decision-tree that filters land from initial interest to final go/no-go. Pin this above your desk.
- Feasibility First™ eBook The foundational text on how to think about land feasibility before any money moves.
- The 32 Red Flag Library Quick-scan reference of the 32 most common land problems — what each looks like, what it means, and exactly how to respond.
- Pre-Feasibility Site Evaluation Checklist The go/no-go tool you run before committing time and resources to a full Phase III.
- Land Budget Calculator (Excel, Numbers, Google Sheets) Input your numbers. Read the output. Know what the land is worth before you negotiate.
- RLV Calculator (Excel) The Residual Land Value math developers use to back into what they will pay for a parcel.
- Land Genius AI Companion AI-assisted research support for complex land questions and unfamiliar zoning scenarios.
- GIS Workbook Step-by-step guide to navigating public GIS systems. No prior GIS experience required.
Today: $498.50
Total Value: $997
âś“ Lifetime access
âś“ 14-day money-back guarantee
✓Start today
IMPORTANT DISCLAIMER
The 32 Red Flag Library is an educational diagnostic tool. It does not constitute professional engineering, environmental, or legal advice. All land feasibility decisions should be made in consultation with licensed professionals (engineers, surveyors, attorneys) and supported by a complete LOT LOGIC™ Phase I, II, and III analysis.